Location: Orleans, ON

Client Request: Entire bathroom to be renovated and updated.

Challenge: Needed project evaluated and completed, as a previous contractor failed to meet the client’s quality and timing standards.

Results:

  • Assessed workmanship from previous contractor and redefined scope of work required to complete the job
  • Installed all new: shower, sink, toilet, and tiling on partial wall and entire floor
  • Installed all new: plumbing, baseboards, drywall
  • Painted walls

Healthy Steps: All wood used meets FSC standards. Low flow toilet installed (energy efficiency). Materials for tiles and drywall consist of some reclaimed material and helps contribute to LEED points.