Location: Orleans, ON
Client Request: Entire bathroom needed an overhaul and to be updated.
Challenge: Cody, the contractor, noticed that there may be traces of asbestos and as a precaution, proactively tested a sample for the client. Sample results were clean indicating no harmful chemicals present.
Results:
- Consulted with client to select and install all new: shower, sink, toilet, tiling and fixtures
- Installed drywall and added new baseboards
- Painted walls and installed new plumbing throughout bathroom
Healthy Steps: All used materials/fixtures removed were donated to “Re-Store” (a Habitat for Humanity subsidiary). Materials included faucets, wood, shower stall. Low Flow toilets installed (energy efficiency). All wood conforms to FSC standards. Materials for tiles and drywall contribute to LEED points.